Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / mughalsab
if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
Define polar co ordinates.
How is make concrete cube?
What is meant by solid geometry?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
how statics is different from dynamics
Detection of a beam & a girder are––––
What is the sugested procedure of water purification for public supply?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What are the common ways of demolition?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
what is the anchorage length of reinforcement.
Test procedure of fly ash bricks as per code ?
How to do bbs in excel format
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire