Middle point of any slab is raised 10-12 mm during
shuttering work because––

Answer Posted / mughalsab

if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1606


How do you convert wind speed into force?

727


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1902


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1438


Mention what are the composition of a landfill?

722






what is the formula to find the diagonal shape stirrups?

1434


what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1888


can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1226


TELL ME THE EQUATION FOR OGEE SPILLWAY

2170


What is the sugested procedure of water purification for public supply?

1717


brickwork labour rate per cum ?

1101


why we are using stub column..? is it possible to construct steel stub column..?

1507


What things architect have to take care of before starting any project?

743


how to calculate the length diamond shaped striupps in column

2202


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1680