Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How is rate analysis prepared for M 25 grade of concrete?

Answers were Sorted based on User's Feedback



How is rate analysis prepared for M 25 grade of concrete?..

Answer / pranav

Calculate the quantity of coarse aggregate + sand +cement +
method of placement + shuttering + method of curing

Is This Answer Correct ?    83 Yes 12 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / g pavan kumar

calculate the coarse aggreate+cement+quality
expensis+considered traveling charges+electric power
charge+technical persons charge+shurtring+curing cost and
additional mixing cost.

Is This Answer Correct ?    11 Yes 1 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / simarpreet upweja

Total Cost will be Material cost + Labour cost + Mode of pouring + mode of mixing and transit + Shuttering Cost + Curing cost in later stage

Material cost will include cost of water + Recron(any fiber if adding) + admixer + coarse aggegate + fine aggregate + sand + Cement + Flyash (if using crush sand).

There are many ways of mixing.
i) If using batching plant then cost of transit millers and plant.
ii) If mixing is done at site by mixer then there will be no cost of transit.
iii) If mixing is done manually then it will be covered under labour cost.

Labour Cost : Self Explanatory

Shuttering Cost : As per surface area multiplied by cost per unit area.

Curing Cost : Self explanatory. Curing can be done by many ways so first you will have to decide method.

Is This Answer Correct ?    3 Yes 0 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / fayyaz tabussam

calculate the concrete batching plant running cost,material
cost,shuttering cost,curing cost.

Is This Answer Correct ?    15 Yes 17 No

Post New Answer

More Civil Engineering Interview Questions

hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

0 Answers   SOM,


How did the romans get water up hills using aqua ducts?

0 Answers  


how many no of solid blocks and bricks required for construction of wall for 100 sqft?

14 Answers   Vipul,


Describe the advantages and disadvantages of using plastic and timber fenders?

0 Answers  


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

0 Answers   IVRCL,


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

0 Answers  


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

0 Answers  


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

0 Answers  


What is the standard volume of pharma in cub ft

0 Answers   Deepa Constructions,


Is it possible 18" beam rest on 18" beam and created the junction on beam instead of column?

1 Answers   Nespak,


what is detail procedure of eccentric footing? plz. give solved exmple?

0 Answers  


1. What is difference between auto level & dumpy level?

2 Answers   Qatar Airlines, Sita Homes,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)