Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How is rate analysis prepared for M 25 grade of concrete?

Answers were Sorted based on User's Feedback



How is rate analysis prepared for M 25 grade of concrete?..

Answer / pranav

Calculate the quantity of coarse aggregate + sand +cement +
method of placement + shuttering + method of curing

Is This Answer Correct ?    83 Yes 12 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / g pavan kumar

calculate the coarse aggreate+cement+quality
expensis+considered traveling charges+electric power
charge+technical persons charge+shurtring+curing cost and
additional mixing cost.

Is This Answer Correct ?    11 Yes 1 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / simarpreet upweja

Total Cost will be Material cost + Labour cost + Mode of pouring + mode of mixing and transit + Shuttering Cost + Curing cost in later stage

Material cost will include cost of water + Recron(any fiber if adding) + admixer + coarse aggegate + fine aggregate + sand + Cement + Flyash (if using crush sand).

There are many ways of mixing.
i) If using batching plant then cost of transit millers and plant.
ii) If mixing is done at site by mixer then there will be no cost of transit.
iii) If mixing is done manually then it will be covered under labour cost.

Labour Cost : Self Explanatory

Shuttering Cost : As per surface area multiplied by cost per unit area.

Curing Cost : Self explanatory. Curing can be done by many ways so first you will have to decide method.

Is This Answer Correct ?    3 Yes 0 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / fayyaz tabussam

calculate the concrete batching plant running cost,material
cost,shuttering cost,curing cost.

Is This Answer Correct ?    15 Yes 17 No

Post New Answer

More Civil Engineering Interview Questions

If concrete fails in cube strength as well as non distactive test? what to do? for example grade of concrete is M35, cube strength is 26.1 n/mm2 after 28 days and non districtive test strength is 28.1 n/mm2 after 28 days. i am not distroying the rcc memeber.

3 Answers  


pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports

1 Answers  


m-25

3 Answers  


Suppose a column is of 1mx1m dimension adn load is of barely 1 ton(no moment), will u provide the total minimum steel reinforcement, if not what will u do..?

1 Answers   Engineers India Limited,


How do you change a dimension value in solidsworks?

0 Answers  


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

0 Answers  


how to calculate steel quantity of column from steel design

1 Answers  


What is Paste :

1 Answers   Future Group,


1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?

2 Answers  


How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?

3 Answers  


For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the weight of sand and aggregate

4 Answers   Lanco, Reliance,


What is the difference between one-way slab and two-way slab?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)