Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / amar kantak
FOR POURING CONCRETE
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
why is the column design?
Basic questions of civil engineering
about higyway engineering
How do you convert wind speed into force?
how to conversation of all construction material in to brass
Are cruise ships built for the transatlantic run?
what is conrete grade ,how are depent on concrete grad and size of concrete?
why we are using stub column..? is it possible to construct steel stub column..?
Define What does civil status mean?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Concrete cover for slab, column, beam and footing?
Questions related to civil.engg in company
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
Define current ucs?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet