Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / amar kantak
FOR POURING CONCRETE
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Can inverted beams used in pipes during construction?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
What is the force exerted by the tacoma narrows bridge?
How do you change a dimension value in solidsworks?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
How is the leaning tower of pisa supported?
The definition of national highway
what is detail procedure of eccentric footing? plz. give solved exmple?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
how many kg of 20mm, 10mm, dust available in one ton stone boulder
what energized you to complete your course?
what is the painting co efficient of slope roof tiles?