Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / amar kantak
FOR POURING CONCRETE
Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
how many BSCs can i connect to the HUAWEI MSC
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
cause of cylinder test failure
Can we apply curing compound on ceiling (slab Bottom)
how to compute slab reinforcements on step by step procedures??
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Floor tile measurement? Wall to wall or skirting to skirting
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is the density of most of construction materials?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
How do you determine specific gravity of cement?
How many types of slabs are there & how to design it?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
what is the minimum compressive strength of clay brick