Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / rj
so as to have a camber at the middle area.
Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
How do you maintain water pressure?
why the profile of shell of natural draught cooling tower is hyperabolic.
how i can tak Quantity of mortar in block work
Dear Sir What is the Contraction joint for base Slab
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What is the use of offset command?
How to calculate the force on a column of three story building. What should be the base concrete height?.
Minimum and maximum size of the building components
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
What is meaning of FREE STANDING STAIRCASE ?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.