Middle point of any slab is raised 10-12 mm during
shuttering work because––

Answer Posted / rj

so as to have a camber at the middle area.

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.

1871


How do you maintain water pressure?

650


why the profile of shell of natural draught cooling tower is hyperabolic.

1607


how i can tak Quantity of mortar in block work

1977


Dear Sir What is the Contraction joint for base Slab

1651






one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1468


What is the use of offset command?

673


How to calculate the force on a column of three story building. What should be the base concrete height?.

1649


Minimum and maximum size of the building components

1762


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

1623


What is meaning of FREE STANDING STAIRCASE ?

2483


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

1588


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1965


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1529


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

2153