concrete cube strength if fail 1 no in 7 days .What is the
solution
Answers were Sorted based on User's Feedback
Answer / bharath
need to go for 3, 7 & 28 days. And care to be taken in WC
ratio & Cube filling process while concrete process
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / shashank
wait till 28 days result will come some time 7 days result
will fail due to poor workmanship will pouring the cube
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / riaz
The actual result come after 28 days but it still depend on weather condition
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ratheesh
If 7th day cube fail, we have to wait 28 day cube result.
Should be use skilled labours...then wont get any cube failure.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / mohd. haider
By checking the strength of member by core cutting or remote hammer test. If strength is OK. Than no problem otherwise take action seriously.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / amar kantak
RECHECK THE STRENGTH AND WATER , CEMENT , COARSE & FINE GRAVEL
QUALITY.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / pk priyadarshi
in three numbers cube one number cube discard and take two numbers cubs average strength if strength is found as per required that is ok
Is This Answer Correct ? | 0 Yes | 0 No |
Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
whatis the banafit of water leak detection and repair?
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
how much quantity of cement bags are required to fill the one m3 of empty container.?
What is IS Code ? And What is IS - 9301 ?
Who name us Engineer & Why?
what is the minimum SBC of soil is required for different types of soil?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?