How can we calculate 8- storied Madrasha Building pile
capacity by taking SPT value at site?
No Answer is Posted For this Question
Be the First to Post Answer
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
0 Answers GVR, Howe Engineering, L&T,
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is Purpose Of Stirrups give In Beam ?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
how to calculate the quantity of plaster.
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
How do You Maintain a structure after getting cube test of low strength.
what are co-efficient for jacks, acro spans and runners for slabs per sft?
how many types of hydraulic coefficints and their values
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)