concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / ratheesh
If 7th day cube fail, we have to wait 28 day cube result.
Should be use skilled labours...then wont get any cube failure.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the method used for marking of cantilevers in hirise buildings by using theodolite
How many kilo-newtons equals 1000 kilogram?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
How to take labor charges for construction of 1cum of concrete?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Explain what is zoning permit?
What is costing in 100squre feet bricks
What is the strength of cement?