how we decide scurt (disc) of insulator
with respect to kv rating

Answers were Sorted based on User's Feedback



how we decide scurt (disc) of insulator with respect to kv rating..

Answer / binod

one disc is rated with 11kv.for higher voltage addition of
disc all disc are connected in series

Is This Answer Correct ?    0 Yes 0 No

how we decide scurt (disc) of insulator with respect to kv rating..

Answer / Avneesh Kumar

The selection of an appropriate disc (scurt) for an insulator depends on several factors, including the voltage level (kV rating), operating temperature, and environmental conditions. The disc is chosen based on standards set by organizations such as IEC (International Electrotechnical Commission) or ANSI (American National Standards Institute). These standards provide guidelines for selecting the correct insulator size, material, and construction to ensure safe and reliable operation.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Define early construction of human being

1 Answers  


Ammeter of 1 ohm resistance measure max 10 ohm to measure higher resistance from it

6 Answers   BARC,


i want to do a project on PLC.... please give me an idea.....

1 Answers  


why we are not giving the zone 1 trip command to the master trip relay

1 Answers  


What is the diffrence between ofline ups and online ups?

3 Answers   Intel,


why are using bus ducts ? why not using cables

12 Answers  


i heard that power factor(PF) is the main concern for industries, if they are maintaining PF around 0.6 they will be fined for that. now the question is, how can they improve the PF ranging between 0.9 to 0.95 which is safe for them i,e escaping from the fine?

5 Answers  


difference between buscoupler & bussection?

1 Answers  


how can u determine size of the conductor by knowing the voltage level

2 Answers  


how we can know which is Lv side and HV side of transformer by just seeing it?

7 Answers  


What is C check in a diesel generator and what are parts and what has to be done during the C check

4 Answers  


What is contract demand in solar system?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)