1:6 mortar, how many self life hours ?
Answers were Sorted based on User's Feedback
Answer / snigda
With in 2.5 hrs, the mix should use otherwise the water
content which is added in composition will absorb by mortar
and mix will become tight.
Then, we have to add the water, where water content for that
mix will increase. Because of the same, Silt content will
increase where cracks develop on the structure (for finishes)
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / anupam nath
though initial setting time of cement is 30 min., so mortar
should also be consumed within this time.
Is This Answer Correct ? | 3 Yes | 0 No |
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
0 Answers Krishna Constructions,
As an engineer, what u should do when the construction of a building doesn't meet the required specifications?
how to find fineness modulus of sand?
why you considers yourself suitable for the post of site engineer
5 Answers Consultancy, Nalco, Ritspin Synthetics,
How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
0 Answers Amit Enterprises, ICT,
What will be the crank length in an staircase is same like an slab?
how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
What is the different type of slump test indications?
appsc AEE'S interview questions wanted
What is the unit weight if concrete?.
28 Answers Doshion, HCC, Jindal, KKR, RCL, Simplex, TCS,
what is grade slabs