Answer Posted / snigda
With in 2.5 hrs, the mix should use otherwise the water
content which is added in composition will absorb by mortar
and mix will become tight.
Then, we have to add the water, where water content for that
mix will increase. Because of the same, Silt content will
increase where cracks develop on the structure (for finishes)
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What are the different types of foundation?
on what basis the partial factor of safety are decided? form the load combinations
how to calculate load bearing column
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
how to do sudoko puzaals?
What does civil status mean?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
what is hydrostatic paradox?
What are the different types of runners?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
what is the formula to find the diagonal shape stirrups?
How does a traffic light signal work ?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
significance of specific surface area of particles?