Answer Posted / anupam nath
though initial setting time of cement is 30 min., so mortar
should also be consumed within this time.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is absolute pressure? How absolute pressure is calculated?
any book or article on pumped concrete.
what r the precaution for high in atp tempareture,low in atp tempareture
What is geopolymer based concrete?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
"Gates of the dams are generally designed of curved shape". Why?
what is a well
what is the maximum number of course that can be laid according to IS code and the max height.
what is called Bulk Density of aggregate?
how to calculate quantity of bricks in circular manhole with examples.
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
What are the RISKS during the project construction?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream