Tell me how you are ready to comply with the employment
rules and regulations if your CV is considered for
employment?
No Answer is Posted For this Question
Be the First to Post Answer
why we usually call 415 volts instead of 440 volts
Is it weather conditions make any problems to the electrical equipments and if yes means is it any precautions needed?
why overload relay is not tripped at time of starting of motor allthough staring current is too high?
how to Select Lighting arrester? What r the parameters to be considered for the selection of Lighting arrester ?
sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.
how to match 0 -10V with 4 - 20mA
Terminal blocks is used for segregate the connections... There is any principle for terminal block..?
Whta is earthing?What is the optimum value of Earth Pit?
Why Neutral Earthing pits and body earthing is interconnected
why stay insulator is not used with stay wire for 11kv Lines. Whereas it is used for LT lines ?
How much current can 11KV line carry? What are the formulae used to calculate current across both side of transformer? Moreover I need to know can I connect 33KV line with transformer of 1600KVA? Details are: V=415, Pf= .9
in a induction motor if we put capacitor across it will the power factor of the motor will improve? if yes how
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)