Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Two electronic energy meters are connected to seperate
phase wires, but connected to a looped neutral. Are these
going to function correctly?

Answers were Sorted based on User's Feedback



Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / rvg

Both ,meters will work satisfactorily.

Is This Answer Correct ?    10 Yes 3 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / guest

yes

Is This Answer Correct ?    5 Yes 1 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / dilip kumar

ofcourse both will work satisfactorily ,but if the
connection is used for measurement of 3-phase power then it
will nither give the correct power nor the correct phase

Is This Answer Correct ?    4 Yes 2 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / jack

surely work
but error in measurement

Is This Answer Correct ?    3 Yes 2 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / karthik

yes, if the the 2electronic energy meters are connected
under the same distribution substation it will work, but if
the 2 energy meters are connected in diffrent substation it
will not function properly, becuse neutral only carrying
return current for the single phase loads, if u connect
your elcb getting trip.

Is This Answer Correct ?    2 Yes 1 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / thirumoorthy

It is assumed that it amounts to measurement of two phases
of power measurement by two single phase energy meters. Then
the meters will work satisfactorily but sum of two will not
give total power

Is This Answer Correct ?    2 Yes 2 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / guru

No, when using the electronic energy meters the neutral
should be seperately connected and not a looping.

For example if any fault currents occur in any one of the
phase both the energy will be recorded.

Secondly and main point is electronic energy meters work on
the principle of taking the higher current reading ( Either
it may be in phase or neutral) so if 02 neutrals connected
in loop the sum of the neutral current on both the circuits
will be recorded and the energy value will not be right one.

Is This Answer Correct ?    2 Yes 2 No

Two electronic energy meters are connected to seperate phase wires, but connected to a looped neut..

Answer / raj varpe

yes as the required input is provided to both energy meters
they will work satisfactorily but they are not usable to
measure 3-phase power correctely

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

Can clean earth cable be considered as low current cable

0 Answers  


what is the difference between ceiling fan and wall mounteed fan technically

3 Answers  


What is diffrence bitween electrical and electronics ?

4 Answers  


Why we use Y-Y connection in power transformer (8-10 MVA, 132 kV to 11 KV)and D-y in distribution transformer (2 MVA, 11 KV to 440 Volts)?

4 Answers  


what is power factor ?

3 Answers  


sir i am ece engineer.i want to job in power plant.what is the best option for me as electrical engineer or instrumentation engineer?pls reply me.

1 Answers  


In the solution of load flow eqation, Newton raphson method is superior to the gauss siedal method because (a)the time taken to perform one iteration in the NR method is less when compared to GS method (b)the number of iterations required in the NR method is more compared to that in the GS method (c)the number of iterations required is dependant on the size of the system in the NR method (d)convergence characteristics of the NR mehod are not affected by the selection of the slack bus

1 Answers  


why nearly all voltages are in the multiples of 11?

5 Answers  


Can anyone explain me about the capacitor calculation

0 Answers  


WHAT IS THE DIFFRENCE BETWEEN EARTHED AND UNEARTHED CABLE (XLPE)?

6 Answers   Essar,


what is the 2MVA distribution transformer efficiency

1 Answers  


in dc shunt generator field is open in running condition what will happen?

8 Answers   century,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)