why it is necessary to short and ground of a current transformer secondary side?..

Answer / pramod sahoo

To protect the CT from static voltage surges resulting in
insulation falure.

Is This Answer Correct ?    4 Yes 0 No

why it is necessary to short and ground of a current transformer secondary side?..

Answer / sheik hussain

if secondary side open ct act as step up transformer so flux
is increased ,for that insulation is not withstand so
vibration and high voltage occurs thats why we should kept
the sec terminals closed condition..

actually ct is not have a pry turn it have only sec tunas,
pry side is like busbar cable conductor ect.,so when s1,s2
is open it mutual inductance is occurs so act as a step up
transformer.. the flux is incresed,insuation get failure

Is This Answer Correct ?    2 Yes 0 No

why it is necessary to short and ground of a current transformer secondary side?..

Answer / simon

The Eddy current's value is too high so the sec side of X-mer is grounded.

Is This Answer Correct ?    1 Yes 0 No

why it is necessary to short and ground of a current transformer secondary side?..

Answer / gunasekhar

because secondary of c.t is of h.voltage

Is This Answer Correct ?    0 Yes 0 No

why it is necessary to short and ground of a current transformer secondary side?..

Answer / abb

Open Circuit secondary side of the Current Transformers
causes saturation due to high voltage induced.

Is This Answer Correct ?    0 Yes 0 No

why it is necessary to short and ground of a current transformer secondary side?..

Answer / k.prakashchandra

Shorting is done ,when the ct is not in use or in case of
spare ct, to prevent development of high voltage in
secondary.Grounding is done to remove the influence of high
primary voltage due to capacitance between primary and
secondary, and insulation failure.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

what is ceiling voltage in an exciter?

1 Answers   KEPCO Energy Service Company,


what is Touch and Step voltages

1 Answers   Pinnacle,


Define peak overshoot.

0 Answers  


how a vibration switch's high signal will going to trip the motor? can u explain with some examplesand wiring diagrams?

1 Answers   Bhel, Wartsila,


What is C check in a diesel generator and what are parts and what has to be done during the C check

4 Answers  






The rating of Transformer are 11KV, 22KV, 33KV instead of 10KV, 20KV & 30KV?

2 Answers  


Technical equations

1 Answers   ME,


What is Energy Audit..?

2 Answers  


how we can calculate cable size for any load & any type of cable material ?

1 Answers  


how the earthing point or earthing is taken for ships and airplanes?

1 Answers  


although ckt breakers have taken the place of old fuse. But instead of it , these older ones are still used in the industries and homes ? why .... what are their advantages and disadvantages ? which one is leading and winning the race and competition ?

0 Answers  


What is the tension required for the 25000 CFM AHU belt

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)