How to do base isolation for RC framed structure using ETABS
software?
No Answer is Posted For this Question
Be the First to Post Answer
explain kn/sqm in detail.
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
what is pH value of sewage&water.if pH value is given then how to calculate H+.
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this
What should be the standard roof height like to be?
Lapping Work Explain Briefly
ratio of rcc 1:1.5:3 grade of concrete ,7days& 14&28 days after curing how much strength of compressive strength in rcc slab
Define What are the reasons for geotechnical site investigations in Uganda?
What is the meaning of M50,20? What is 50,what is 20
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.