The duration for which traffic is restricted after WBM (Water Bound Macadam) road or BST (Bituminous Surface Treatment) work depends on various factors such as the type of material used, weather conditions, and specific project requirements. As for the use of road rollers, they should be used until the surface is compacted to the desired level according to IS codes.
| Is This Answer Correct ? | 0 Yes | 0 No |
OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)
What is modular elasticity?
What is the difference between Grade I, II and III of GSB?
How many times one TMT bars bents & straight upto not broken the bar.
Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.
limit value of bulking of sand
what is water cement ratio m10,m15,m20,m25,m30,m35m ,m40
12 Answers ACME, bscpl, GKC Projects Limited GKCPL, JK Cement, Ketan Bhatt Commerce Group, Mani Associates, Rain Cements, Ramky, Simplex,
what is curtailment in rebars
How to convert sqft in cft
Name the standard sand for concrete tests
Why silt content not allowed more than 6% for Sand ?
what is the Asfalt test?in road constraction..?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)