How many hours should traffic be not allowed after
completing wbm road or bst.and min how many hours should
road rollers be used.
No Answer is Posted For this Question
Be the First to Post Answer
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
why we use minimum cement as given in IS mix design code
a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40
M40 grade concrete has 40 n/mm2 strength.here what"s mean by n?
Whats maxi. slump of M-7.5 Concreit for PCC
2 Answers Indiabulls, Swastik Group,
for gravel roads in India to get 1feet height how much height we have to fill
what formula used to find the length of triangle ring in column?
Kindly tell me a book name to study for BIS exam
What is componsation
0 Answers Nagarjuna Construction,
What is proportion of PCC Grade G?
Define What is the tallest man made structure in the world?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)