MEP design will be majorly three parts.

Electrical:

Load to be calculated after approval of the client. then the cables, panels, lights to fixed.

Plumbing

There are two types here. 1. Water supply system and 2 Drainage system.

ACs - if any

Fire protection system.

Is This Answer Correct ?    11 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calulate short circuit current for the following: 1.cable connecting 11KV of 22KV/11KV transformer to 11Kv of 11KV/415V transformer 2.what cable size should i use.

1636


what is per unit calculation?looking for simple and strong explanation thk u

2446


What is transister define the transister ammiter ,base, colector.

1737


how i can calculate the size for fire cable

1507


What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor

990






where solid grounding and where grounding through ngr done and why?

2102


In a synchronous motor. if start is running at high speed.  What will be the starting torque : Higher Lower Zero

1259


where can the transformer having vector group Yny0 be used??

3598


Why are cables rated for 40 KA for 0.25 Sec fault current rating?

1526


What is essential to prove safe isolation of electrical circuit?

641


The synchronous machine excitation system explain

1335


what is the Pickup/drop off ratio in BCPU relays

4172


What is stepper motor. What is its uses?

661


We have Diesel generator of 200KW. fuel consumption is always same,even connected light load or full load. Is it right?

1749


What is difference between Sample test and Routine test in safety standard?

1302