MEP design will be majorly three parts.
Electrical:
Load to be calculated after approval of the client. then the cables, panels, lights to fixed.
Plumbing
There are two types here. 1. Water supply system and 2 Drainage system.
ACs - if any
Fire protection system.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
how to calulate short circuit current for the following: 1.cable connecting 11KV of 22KV/11KV transformer to 11Kv of 11KV/415V transformer 2.what cable size should i use.
what is per unit calculation?looking for simple and strong explanation thk u
What is transister define the transister ammiter ,base, colector.
how i can calculate the size for fire cable
What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor
where solid grounding and where grounding through ngr done and why?
In a synchronous motor. if start is running at high speed. What will be the starting torque : Higher Lower Zero
where can the transformer having vector group Yny0 be used??
Why are cables rated for 40 KA for 0.25 Sec fault current rating?
What is essential to prove safe isolation of electrical circuit?
The synchronous machine excitation system explain
what is the Pickup/drop off ratio in BCPU relays
What is stepper motor. What is its uses?
We have Diesel generator of 200KW. fuel consumption is always same,even connected light load or full load. Is it right?
What is difference between Sample test and Routine test in safety standard?