how many kg of 20mm, 10mm, dust available in one ton stone boulder
No Answer is Posted For this Question
Be the First to Post Answer
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
what is the exact dia of 8swg and 10swg gabion wire
Which are the top apps for you civil engineering?
what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?
5 Answers NLC, Prakash Engineers,
1. What type of job are you holding at the moment? Name of present / last employer?
How to compute minimum number of columns required for a site from area of site?
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
How to calculate the quantity of ingredients of M20 grade concrete?
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Explain the water bound macadam roag
What is the difference between auto & dumpy level
how to calculate rate analysys of 1:6 plastering 10 sq m
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)