What is the difference between EPC,DBOOT and BOOT.

Answer Posted / surya v kuchibhotla

In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.

Is This Answer Correct ?    15 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define Who designed the city of Washington DC?

631


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

2006


what is the types of surveying?which type of survey carrying for type of work?

1675


what is the meaning of 40/20 src

5760


I have an span length 16 ft c/c

1060






1:4:8 pcc calculation 591 cu.ft

1798


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

738


Different sizes of Hollow blocks and its weight. Thanks.

1924


Is there the dry coefficient of cement is constant?

1830


What is 1/8 on the architect ruler denotes?

648


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1608


pls give me ans to ACT formula cube testing porpuse

2538


procedure for preliminary selection of size of column of 5 storey building

2550


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1650


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2188