What is the difference between EPC,DBOOT and BOOT.
Answer Posted / surya v kuchibhotla
In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.
| Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
what is mean by c32/40s concrete class
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how pumping of concrete effects the quantity of material used in it?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How is make concrete cube?
How to do base isolation using ETABS software?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
What is 1/8 on the architect ruler denotes?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What is meant by Crystal Concrete?
what are the five benefits of using standard terminology in the measurement process?
what is the use in canals of longitudinal drains and cross drains in lining areas?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building