What the codes used for Rigid Pavement and Flexible pavement.
Answer / sudhakar
for rigid pavement is 58-2002
for flexible pavement is 37-2001
Is This Answer Correct ? | 7 Yes | 1 No |
what is the main difference b/w compaction and consolidation
How much shuttering oil required for per m2 shuttering by 12mm ply
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what is the construction cost for per cft of multistorryed building in kolkata?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
0 Answers Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
WHAT TYPE OF MATERIALS (CHEMICALS) ADDED IN CONCRETE TO INCREASE THE STRENGTH OF CONCRETE?
What is the difference between normal brick & concrete hollow blocks in all aspects?
procedure for preliminary selection of size of column of 5 storey building
how i can tak Quantity of mortar in block work
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,
define the grain size analysis and what is the silt size?
what is the praposion of M30 concrete mix.