Hi I had missed my mark list (first year-apr2003)how i
search in my old mark details in internet and which web
site? pl inform me in full details..
No Answer is Posted For this Question
Be the First to Post Answer
how to find out the quantity of cement sand and aggregate in slab and flooring
why primer application is required before applying putty
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
DESIGN OF TRUSS ELEMENTS
what is curing?
What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
Why beam breadth smaller than depth
what is a pretension and post tension with an example
how much cement and sand 1:6 plastering
the building construction what type of equipments are used in site and its purpose?
what is the use in canals of longitudinal drains and cross drains in lining areas?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)