in my observation NCT is used at Karnataka power
transmission. why we are not used in andhra pradesh
How to do fabrication , busbar and wiring cost for : 1. LT Panels 2. C& R Panel
6. A DC AMMETER HAS R=0.1 OHM & CURRENT RANGE IS 0-100 A IF THE RANGE IS TO BE EXTENDED TO 0-500 A THEN METER REQUIRES SHUNT RESISTANCE OF ..........
what is the reason the main breaker is trip during the motor is running? (some time the breaker is not trip)
Calculate the demand in KVA for a three phase 440V power source drawing 1100A current
For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.
our company have 750 kva oil transformer.still we have facing a problem that is when voltage is 11.5 kv coming from HT side then LT-side voltage is 420v or above at tape 1.please give me best solution to decrease the voltage.
anybody can give the voltage value for 1M ohm
Hi, My question is our total motor load is 55 kw.so what cable size required for main supply. Please reply
what is advantage of using star to delta in place of dol starter
What is phase cross over frequency?
We have got the HT connection of 1000 KVA in which we have installed a seprate APFC panel at the PCC end & seprate KWH meter is installed. My question is that does the KWH reading shown in the meter is a part of the Consumption ???? ( approx 500 units is shown)
11. As per the theory current doesn’t flows in Neutral, but practically it is not applicable, explain why? 12. How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test? 13. Why the transmission lines are in 11kV, 22kV, 33kv, and why not 10kV, 20kV, 30kV? 14. Why do we generate 3 Phase AC Supply? It is possible to generate 4 Phase and 5 Phase explain it? 15. Explain why the Voltage drop will happen in 3 Phase line? 16. What is the equipment used to control the generator output? 17. What are the factors to be considered during the Synchronization? 18. What should be value of Circuit breaker operating time and tripping time? 19. Why the CT Secondary is rated as 5A generally? 20. At which time Synchronous generator act as a Synchronous Condenser?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)