Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Whats maxi. slump of M-7.5 Concreit for PCC

Answers were Sorted based on User's Feedback



Whats maxi. slump of M-7.5 Concreit for PCC..

Answer / kuldeepkumar

50mm

Is This Answer Correct ?    10 Yes 0 No

Whats maxi. slump of M-7.5 Concreit for PCC..

Answer / jainender

NO slump

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Define What is a projection line?

0 Answers  


how the find the quantity of water used to make 1 cubic meter concrete mortor

1 Answers   Appco,


How much steel required for 1 sq. meter area?

1 Answers   Aditya Constructions,


How to calculate Cement, Sand and Kapachi required for M20, M25

3 Answers   NCC,


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

0 Answers  


Describe the various methods of concrete curing?

0 Answers  


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

0 Answers  


WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED FOOTING??

9 Answers   L&T,


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

0 Answers   ACC, DLF, L&T,


What is meant by engineering drawing?

0 Answers  


is plate load test can be done on cohesive soils for immediate settlements ?

2 Answers   ONGC,


bulkege of concrete for design mix concrete for grade m30

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)