Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
Answer / karnam seenu
mail me at karnamseenu@gmail.com for your requirement
Is This Answer Correct ? | 0 Yes | 0 No |
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is compressive strength of bricks?
brick work 1cum kitne cft hote hai
I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?
Rate analysis of Design mix concrete M50 and M60 DMRC
What are the causes of building collapse?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Which is code is used for measurmenr of reinforcement steel work.
Explain what is the release of lien?
how calculate bench mark errors
WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?
Which type of question ask for written test for civil diploma trainee