Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
Answer / karnam seenu
mail me at karnamseenu@gmail.com for your requirement
| Is This Answer Correct ? | 0 Yes | 0 No |
Mixing of cement, sand & stone chips with oil will not give strength because ––
Detection of a beam & a girder are––––
what"s the abbreviation for P.C.C? what"s the formula to calculate 1m3 P.C.C consumption?
2 Answers ACIL, L&T, Punj Lloyd Ltd, Rajshree Construction,
brick work 1cum kitne cft hote hai
What are the techniques to measure road difference?
is there any information regarding MPSC2010
In which direction is bottom bar of rectangular footing is placed in short or long.
In cement concrete how to check a quality of material also proportion of material at site ?
What is the average density of soil?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
why reinforcement is not provided at centre for beams r column
during site visit if i find voilation going on,what can i do,how i act?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)