how to caculate cutting lenght in bar bending schedule for
180 degree bend
Answers were Sorted based on User's Feedback
Answer / nil ratan adhya
180 degree bend means bar straightline or parallal line so cutting length actul dimentional length
| Is This Answer Correct ? | 36 Yes | 9 No |
Answer / vishal
for 90degree is 2d for 180 degree how much is cutting length
please answer from vishal
| Is This Answer Correct ? | 14 Yes | 5 No |
Answer / vinod kumar, sriharikota
GENERALLY 90DEGREES BEND IS 2D, 180DEGREES MEANS IT IS STRAIGHT BAR THE CUTTING LENGTH IS TAKEN INTO ORIGINAL LENGTH OF BAR.
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / anvesh
the standard bending shape is U..
the minimum cuttin length for 90degres bend should be 4d. nd
it should not 3d
for better grip..
the total length reuired for hook is 12d measured starting
from the point the bar start to bend.
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / amol pawar
For 135 180 and 90 degree bend hook length is 12D ,9D, 8D
Where D is diameter of bar
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / narendra
for 90 degree 6*diameter of bar and for 180
degree 9*diameter of bar
| Is This Answer Correct ? | 2 Yes | 5 No |
WHAT IS THE MELTING POINT OF STEEL?
what is ment by water cement ratio
2 Answers CSIR, GIPL, Madhucon, NBCC, TCS,
what is the nomimanal size' os agg.'for reinforced concrete 2 th ph value of water to be used in conc. Shall generly be
clear cover means the distance between main bar outer face to shuttering face. Is it right?
is excessive curing for brick work is good or bad for the walls?
how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?
how calculate bench mark errors
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
what opc & ppc cement $ composition?
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)