how to caculate cutting lenght in bar bending schedule for
180 degree bend
Answers were Sorted based on User's Feedback
Answer / nil ratan adhya
180 degree bend means bar straightline or parallal line so cutting length actul dimentional length
| Is This Answer Correct ? | 36 Yes | 9 No |
Answer / vishal
for 90degree is 2d for 180 degree how much is cutting length
please answer from vishal
| Is This Answer Correct ? | 14 Yes | 5 No |
Answer / vinod kumar, sriharikota
GENERALLY 90DEGREES BEND IS 2D, 180DEGREES MEANS IT IS STRAIGHT BAR THE CUTTING LENGTH IS TAKEN INTO ORIGINAL LENGTH OF BAR.
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / anvesh
the standard bending shape is U..
the minimum cuttin length for 90degres bend should be 4d. nd
it should not 3d
for better grip..
the total length reuired for hook is 12d measured starting
from the point the bar start to bend.
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / amol pawar
For 135 180 and 90 degree bend hook length is 12D ,9D, 8D
Where D is diameter of bar
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / narendra
for 90 degree 6*diameter of bar and for 180
degree 9*diameter of bar
| Is This Answer Correct ? | 2 Yes | 5 No |
How to calculate the number of reinforcing bars in a slab
6 Answers Aldowin Industries, NBCC, THDC,
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
how to calculate amount of materials for concreting and plastering?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What is the force exerted by the tacoma narrows bridge?
Why the statue of liberty is made of copper?
what is density of flyash?
what is the weight of 12mm aggregates?
what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Explain Different types of raft foundation
what is flashing?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)