how to caculate cutting lenght in bar bending schedule for
180 degree bend

Answer Posted / vishal

for 90degree is 2d for 180 degree how much is cutting length
please answer from vishal

Is This Answer Correct ?    14 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the material consumption- cement,sand,tiles etc for Toilet dado?

7044


What is the maximum strength of cub compress strength in one cub testing

1377


is basic cost of the material includes tax?

1524


In block work seawalls what is the purpose of slip joints?

748


what is pouring and explain

1817






List out some of the checking’s, done at the completion of construction?

701


what is the breaking strength of wall tiles

1940


What is Architect-Prepared Contract?

721


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11527


What is an ice dam sock?

696


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1939


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1638


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1381


What is the use of extruded feature in solidsworks?

768


How to find CN by using arcgis 9.3?

1877