Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to define that what is resister ,capacitor& inductor.



how to define that what is resister ,capacitor& inductor...

Answer / balaji

RESISTOR;
resister is a current limiting device.it is used to
limiting the current as well as the increasing...
INDUCTOR;
the inductor is the device which is used to storege of
voltage and current....
CAPACITOR;
capacitor is device it performing charging and
discharging....

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

In order that work may be done:(a) Two wires are necessary(b) The circuit must have a switch(c) Coal must be burnt(d) A supply of energy is required

1 Answers  


what is the value of current and voltage that our body can resist ?

3 Answers  


If you don’t have coal, salt and copper, then how would you earth your connection temporarily at a camp site.?

2 Answers   Focus,


how the capacitance is caluclated if the load is varying to keep the power factor constant(above0.95)

1 Answers  


power transmission pole used one support , that only for support or earthing

0 Answers  


types of central Air conditioner plant?

0 Answers  


What is the difference between Derived earth Fault and measured earth fault.How it works.

1 Answers  


how to checking earth restence with earthtester

1 Answers   NTPC,


what is the gas pressure at normal & operating conditions of sf6 cb??

2 Answers  


What is the type of electrical earthing recommended in hard rock area

2 Answers  


Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?

0 Answers  


Due to velocity saturation, MOSFET reaches saturation a.Before Pinch off b. After pinch off c. At Q point d. Before Q point e. After Q point

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)