Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How many Sqm can laid Vitrified tiles
for flooring per day per masan?

Answers were Sorted based on User's Feedback



How many Sqm can laid Vitrified tiles for flooring per day per masan?..

Answer / guest

15 sqm

Is This Answer Correct ?    12 Yes 1 No

How many Sqm can laid Vitrified tiles for flooring per day per masan?..

Answer / c.babu

12sq m

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

0 Answers  


what is weight of asphalt concrete

4 Answers   Schneider,


what is the compressive strength of concrete cube of ratio 1:6:12?

3 Answers  


what is the density of steel and concrete in kg/m3?

7 Answers   Nespak,


what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35

3 Answers  


what is the formula to calculate costing of rubble soling and wbm in road works?

1 Answers  


6. What would your co-workers say about you?

0 Answers  


How do you calculate load bearing capacity of a waffle slab?

0 Answers  


sometimes, in a column, reinforcement is provided equally on 2 sides and sometimes on 4 sides.what will be the difference in the method of designing?

3 Answers  


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

0 Answers   Talib and Shamsi Constructions,


how can we calculate the quantity of cement, sand, aggregate in any concrete mix

2 Answers  


I need to constructive work in amaraj batteries

0 Answers   Amara Raja,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)