Answer / prashanth
Project planning includes
1.Defination
2.Scope.
3.Budgeting.
4.Scheduling.
5.Construction phase.
6.Closeout of the project.
Is This Answer Correct ? | 9 Yes | 0 No |
Answer / saikiran.ch
Project planing is a part of project management,which relatess to the use of schedules such as Gantt charts to plan and subsequently report progress within the project management.
Is This Answer Correct ? | 3 Yes | 0 No |
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What is Niminal mix and Design Mix ? write difference between them ?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
what are the differences between opc cement and ppc cement in applications?
What is the meaning of soil reinforcement?
What are the tests on concrete?
For the construction project what capital cost has to be taken in consideration?
waht are pressure bulbs
9. What have you done to improve or develop your knowledge / professional qualifications in the last year?
Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
material requred for 1 square foot lanter with formula