In csae of hume pipes NP stands for Non Pressure bur what
does it really mean?
No Answer is Posted For this Question
Be the First to Post Answer
Explain what is progress payment?
What is the outturn of Ceiling plastering
shuttering consumption per square feet in multi storeyed building?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
define silt?
It needs contour survey before plastering a wall / column & floor tiles setting to get––
what is the specification for silt content in sand
Allowable wastage for ready mix concrete?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is progress payment?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
please send me bhel questions on rupesh.017@rediffmail.com
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)