What is the primary difference between adsorption and absorption?
No Answer is Posted For this Question
Be the First to Post Answer
Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?
What is horizon or horizontal mining?
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
What is the basic difference between construction and infrastructure
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what are the criterias for designing a school lab? for e.g a chem lab.Does it depend on room size or no. of students?
how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
what is the mean of opc cement and conceret grade 53 n?please explane with detail>
what is the allowable silt % in river sand for Dam concreting.
What is an inverted beam??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)