Answer Posted / prashanth
Project planning includes
1.Defination
2.Scope.
3.Budgeting.
4.Scheduling.
5.Construction phase.
6.Closeout of the project.
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Which stone is best for wall construction Laterite Stone or Cement Blocks
What is the difference between tor steel and tmt steel?
what is called Bulk Density of aggregate?
pls give me some basic informations in construction of a structure?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is OSHA compliance?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
what is the anchorage length of reinforcement.
How did the romans get water up hills using aqua ducts?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
How many square meter can mason layout chb per hour
What is the cost difference between site mix and ready mix concrete per cubic meter
what is the productivity in aluminium shuttering per day