Answer Posted / prashanth
Project planning includes
1.Defination
2.Scope.
3.Budgeting.
4.Scheduling.
5.Construction phase.
6.Closeout of the project.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what is the method used for marking of cantilevers in hirise buildings by using theodolite
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
what is the construction cost for per cft of multistorryed building in kolkata?
What is thumb rule in quantity and cost estimation of a residential building?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
Define What does civil status mean?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
How to find the cuplock pipe qty in staging for Minor bridge?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is mean by c32/40s concrete class
What is thumb rule in quality and quantity estimation of a Residential building??
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.