Answer / dinesh
If CM 1:4 and 20mm tk
cement= 1/4*1440= 360 kg/cum
for 20mm tk = 360* 0.02 = 7.2 kg/ sqm
Is This Answer Correct ? | 51 Yes | 19 No |
Answer / rajkumar
considering for 1 sqm area, then dry volume of mortar= 1*1*.025= .025 cum
for wet volume of mortar increase it by 20%
so, 0.025*20%+0.025 = 0.03 cum
now considering ratio of 1:4 then 0.03/1+4 =0.006/0.0345(volume of 1 bag) =0.18 Bag
for kg = 0.18*50 =8.7 kg/sqm
Is This Answer Correct ? | 7 Yes | 2 No |
What is the capacity of Maharashtra in power generation by winds?
5 Answers MPSC, State Bank Of India SBI,
Use of coping on terrace wall and in 4" wall is compulsory or not ?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
How to calculate measurement box size for M25 grade cement?
3 Answers Perunding Omega PMC,
How many square meter can mason layout chb per hour
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
0 Answers Public Service Commission,
what is tensile strength?
what do you understand by M25 concrete
Define What is the tallest man made structure in the world?
what is minimum steel area required for rcc slab
what is thumb rule exactly?
why steel is used in rcc columns? what is its purpose?