Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


if column length is 12'(feet) then how to take ring bar on it?

Answers were Sorted based on User's Feedback



if column length is 12'(feet) then how to take ring bar on it?..

Answer / dharamdas sahu

8mm dia bar 200mm c/c

Is This Answer Correct ?    2 Yes 1 No

if column length is 12'(feet) then how to take ring bar on it?..

Answer / mukesh gautam

first of all i told u ...in construction never use fit in steel and other ...
only use all dimension in mm..
so ur qus...
1'=304mm
12*304=3648

spacing of ring given in drwaing ..an idial use of ring spacing 100 c/c
so....3648/100=36.48=37 ring

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what is the different between np2& np3 rcc hume pipe

1 Answers  


Method for Calculating the WEIGHT OF ANGLE ?

3 Answers  


What are the different theories of failure under static load?

0 Answers   Bechtel,


Who built the sears tower?

0 Answers  


How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?

2 Answers  


What is the Laplenth for Reinforcement for Verticl and horizontal Structures as per IS code?

4 Answers   DLF, L&T,


Maximum foundation pressure under PRCC box is 19 T/Sqm and net safe bearing capacity is 12.65. Is it safe? pl help me

1 Answers   Indian Railways,


Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?

0 Answers  


The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl

1 Answers  


What are the steps involved in the concreting process?

0 Answers  


what are the compressive strength requirements(in 7 days & 28 days) of cement sand mix used for plastering purpose (Cement:sand-1:6)? Kindly give the IS Code reference also.

3 Answers   L&T,


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)