Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Dear sir,
What is the procedure for total station?How to
calculate?

Answers were Sorted based on User's Feedback



Dear sir, What is the procedure for total station?How to calculate?..

Answer / kumars

TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.


FROM KUMAR

Is This Answer Correct ?    17 Yes 2 No

Dear sir, What is the procedure for total station?How to calculate?..

Answer / sundarapandiyan

the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,

Is This Answer Correct ?    6 Yes 1 No

Dear sir, What is the procedure for total station?How to calculate?..

Answer / abhishek raj

TOTAL STATION IS BASCIALLY A SURVEY INSTRUMENT,WHICH IS USED
FOR LONG DISTANCE SURVEYING..!!!!

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

Which ratio use for cement selery???

0 Answers   Engineering,


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

0 Answers   SOM,


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

0 Answers   L&T,


what is the difference between volume and weight batching and which is better?

2 Answers   ECCI,


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

0 Answers   IOCL,


How to calculate the quantity of water in cement mortar eg. CM 1:3?

2 Answers   FuRyu,


what is advantage of vdf flooring ?

2 Answers   FH, NSL,


how much quantity of mortar required for cement pointing work?

0 Answers   City Corporation, Pragya Construction, Simplex,


Diagonal check is required for a layout work to confirm ––

3 Answers  


which one is economical construction brick masonry or sold block masonry?

3 Answers  


how much quantity of cement bags are required to fill the one m3 of empty container.?

12 Answers   MSPL,


Why use of fly ash in cement

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)