Answer / kumars
TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.
FROM KUMAR
| Is This Answer Correct ? | 17 Yes | 2 No |
Answer / sundarapandiyan
the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / abhishek raj
TOTAL STATION IS BASCIALLY A SURVEY INSTRUMENT,WHICH IS USED
FOR LONG DISTANCE SURVEYING..!!!!
| Is This Answer Correct ? | 5 Yes | 2 No |
Quantity of cement in kgs for different proportions and different thickness in plastering work per 1 sq.m. And how to estimate this quantities.
2 Answers Al-Jaber, IVRCL, L&T,
how many m3, mason should done per day if he going to build 4.5 inch brick work(partition wall)?
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
What is the ratio of materials used for M10, M15, M20 & M25 grades of concrete? Also specify the quantity of water used in each grade & how to calculate it?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
0 Answers Talib and Shamsi Constructions,
How much cement+aggregate+sand will be required for making K 150 ready mix for 1 CBM. Strength of Concrete is not mentioned only detail is K150, what i understand of K150 is the weight of cement and what does kg/m3 means.What will be the design for K300 concrete.
what is the material consumption of 1:2:4 by kilogram?
Mean of m25 concrete
8 Answers Artech, Dream Careers, KND Engineering, L&T, Trans Concrete,
Does brick grows bigger every year?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
How will you Engage Labours on Site?
0 Answers Amarprakash Developers,
Why ss Steel is not using in RCC concrete.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)