Dear sir,
What is the procedure for total station?How to
calculate?

Answer Posted / sundarapandiyan

the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1510


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2046


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2513


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1671


Basic civil interview questions 

1865






What is OSHA compliance?

694


what does the track parameter mean in staad.pro?

5468


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

1762


How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.

2190


What is the difference between Hinged and pinned in Column ends

4788


how many types of survey and what are levelling instrument?

1561


what is the coefficient for running feet to cft coversion both area and price

1933


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1675


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10227


What are the materials used in building a gravity dam?

647