What is the procedure for total station?How to
calculate?
Answer Posted / sundarapandiyan
the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is Refuse Area In High Rise Building ?
How do you determine specific gravity of cement?
How high should the water tank be to provide a 60 psi at base of this water tower?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Can we use the flyash bricks in brick bat coba?
what is diversion?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
Special thing in designing a overhead reservoir ? which is different from an ordinary design
What are the responsibilities of a construction manager?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
How to find beam R/F cutting length
what is meant by residual strain?