Dear sir,
What is the procedure for total station?How to
calculate?
Answer Posted / kumars
TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.
FROM KUMAR
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
What will you do if you encounter problems like accidents?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Why are separation membranes used between concrete pavement slab and sub-base?
what is Short bored pile foundation.
What is the cost difference between site mix and ready mix concrete per cubic meter
at what pressure ply-wood is obtained by gluing wooden sheets
The foundations are placed below ground level, to increase?
What is demising walls?
pls tell me , what is the water content
psc girder detail
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is the formula for Mass of cement grout (Dg)=???
how much repeitation for conventional and maivan formwork?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?