How much cement+aggregate+sand will be required for making K
150 ready mix for 1 CBM. Strength of Concrete is not
mentioned only detail is K150, what i understand of K150 is
the weight of cement and what does kg/m3 means.What will be
the design for K300 concrete.
Answers were Sorted based on User's Feedback
Answer / sjtbehera
as we know m150 grade but k150 i donot know. if any company
develop this i donot know.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / suresh bariya
just send request for information to the respective
consultant/ Architect who gave this details.
in concrete grade "M" stand for the mix and then
number "150" stand for the strength.
| Is This Answer Correct ? | 1 Yes | 1 No |
What you understand by building codes?
how we calculate the grade of the Bituminous materials.?????
What is the role of a PMC(project management consultancy) in any construction work?
How to preparation billing for high rise building? anyhow can give the tips
explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting
what is tension & compression of steel bending.
minimum spacing of bars in column????as per code...???
7 Answers PNC, Rajesh Associates,
how to calculate result on Plate bearing test?
what is P.C.C ?
what shape of coarse aggregates are ideal for concreting?
how to convert udl into point load??
best option for job in construction govt or pvt for engg
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)