Dear sir,
What is the procedure for total station?How to
calculate?
Answer Posted / abhishek raj
TOTAL STATION IS BASCIALLY A SURVEY INSTRUMENT,WHICH IS USED
FOR LONG DISTANCE SURVEYING..!!!!
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How we calculate the service time of buildings
What will you do if you encounter problems like accidents?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
How can we make a hole in a solid rectangle using solidsworks?
What is portland cement
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
In reclamation works what are the importance of geotextiles and sand?
How to calculate chejja reinforcement
what is the steel difference between np-2 and np-3 pipes and weight also
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
can any one explain bar bending schedule of bems and columns and slabs ??
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What should be the standard roof height like to be?