how to calculate shuttering design & position & quantity of
props & type of method for succsessful work
Answer / guest
First calculate the area of form works and divided by
300mm.That is the quantity of props
| Is This Answer Correct ? | 2 Yes | 4 No |
whate the size of bricks are avalable at site
what would be the design load of R.C.C Cooling tower per cell.?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
which of the following scale is largest one 1cm=50m and 1cm=50km
How do you determine specific gravity of cement?
Can a 24" RCC beam can rest on 18" RCC beam.
what is shear force
2 Answers NLC Neyveli Lignite Corporation Limited,
what is procedure of ordinary pile foundation detial?
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is the difference between Stress & Strain?
first wt is reqd. for making a mix design of concrete & the procedure of determining the qty. of material used in concrete.
how much cement consumption in box type waterproofing
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)