how to calculate shuttering design & position & quantity of
props & type of method for succsessful work
Answer / guest
First calculate the area of form works and divided by
300mm.That is the quantity of props
| Is This Answer Correct ? | 2 Yes | 4 No |
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
What is the % steel required for a 3x3 slab.
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
what is mixed design, define it? what is way beecher?
what are the values of compressieve strenght?
What is tha cutting lenght off samosa ring in column 300*600.
shear stress where is max.min in beams?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
We are working building soling work so soling thickness given 230mm but total are 50 cum. So I am purchased how meny tons is here spreading plz. Tell me
1 Answers GKC Projects Limited GKCPL,
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
What Is the meaning of M15 and M20
Why I-section is preferred to channel section?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)