1)define the critical items in rcc framed G+18 bldg. as Cr
Activity 1,Cr Activity 2,Cr Activity 3...etc.
2)on what logic is MSP and Primavera planning based.FS SF
FF...
Answers were Sorted based on User's Feedback
Answer / noor
The logic behind the MSP and primavera is CPM(CRITICAL PATH METHOD). FS,SF, FFand SS are used in relationship assigning the successors and predecessors for activities .
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / prashanth
1.Sub structural works
Mass excavation,Footing works,Plinth works,backfilling
(required),Drainages,Plumbing works
2.Super structure works
Columns,Slab,block work,joinery,plastering,Tiling works.
3.Fire line,water line,Electrical works.
4.Snags/Punch list.
5.Final handover.
Is This Answer Correct ? | 0 Yes | 1 No |
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
what is diffreant between the english bond&flamish bond
what is mean by compressive strength
what is tmc ,term is used in measureing water, pls tell me 1 tmc = how many litres?
18 Answers College School Exams Tests, Irrigation, IT Consulting Services, IVRCL,
Moisture content calculation for diff mix ratio's ??
What is specific gravity & how it is calculated
calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum
how much quantity of mortar required for cement pointing work?
0 Answers City Corporation, Pragya Construction, Simplex,
What does 'M' stands for in M24 bolt ?
What is relation between weight and grade of concrete?
RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.
2 Answers ABS Construction, L&T,
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)