1)define the critical items in rcc framed G+18 bldg. as Cr
Activity 1,Cr Activity 2,Cr Activity 3...etc.
2)on what logic is MSP and Primavera planning based.FS SF
FF...

Answer Posted / prashanth

1.Sub structural works
Mass excavation,Footing works,Plinth works,backfilling
(required),Drainages,Plumbing works
2.Super structure works
Columns,Slab,block work,joinery,plastering,Tiling works.
3.Fire line,water line,Electrical works.
4.Snags/Punch list.
5.Final handover.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is difference between GTS bench mark and temporary bench mark

3923


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1299


what is the use in canals of longitudinal drains and cross drains in lining areas?

1371


How does siphoning work?

820


What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

1899






Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

10810


what is column foundation

1830


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1165


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1950


How much cement is require in one sqft area in a G+3 residential construction.

1584


Differentiate orthographic and isometric projections?

638


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1495


What is the difference between Hinged and pinned in Column ends

4772


what is w/c ratio in dry lean concrete for m10 mix design

7972


what is the list of building construction equipment & teir output?

1686