1)define the critical items in rcc framed G+18 bldg. as Cr
Activity 1,Cr Activity 2,Cr Activity 3...etc.
2)on what logic is MSP and Primavera planning based.FS SF
FF...
Answer Posted / prashanth
1.Sub structural works
Mass excavation,Footing works,Plinth works,backfilling
(required),Drainages,Plumbing works
2.Super structure works
Columns,Slab,block work,joinery,plastering,Tiling works.
3.Fire line,water line,Electrical works.
4.Snags/Punch list.
5.Final handover.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how can calculate cutting length of diamond ring
what is cross hair cursor?
How to construct a water sump in a rocky soil?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
How do we determine the specific gravity of a cement?
What is the use of water table & Kreb stone for drain
What is the crank length in the slab?
how do we design mix ratio?
Explain what is progress payment?
How you can use different dimension tools in cad? What are the different dimensions available?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
Form where IS456 is adopted in 1978?