what are the challenges of being a team leader and a
supervisor?
No Answer is Posted For this Question
Be the First to Post Answer
What is bylayer?
what will be the grade for M 30 ,35,40,45,50,55???
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
what is the percentage of binding wire required for 1 mt of steel binding in gerally
you are working as a QC in hihg rise building. when what"s ur responsibilities works?
how to calculate water proofing area and what is the easy process. explain
How we decide the the load combinations for design of RCC structures?
WBM Road aggregates quantity calculation
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Explain what are the skills required to become an architect?
Explain creep?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)