what are the challenges of being a team leader and a
supervisor?
No Answer is Posted For this Question
Be the First to Post Answer
how many labour is required for 1cum of concrete?
What is meant by solid geometry?
how much cement is required for 100 sft plastering of ratio 1:4
6 Answers Confident Group, L&T, M N Creations,
what is the difference between factor of safety and partial safety factor.??
unit weight of fine concrete??
What is the difference between NP2 and NP3 Class RCC Hume Pipes
5 Answers Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,
What is the meaning of Fe415 ?
6 Answers Arul Constructions, L&T, SSM,
one litre of shuttering oil how much area covered the shuttering?
What is the different type of slump test indications?
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
what is gunter's chainm. what is yhe number of links in chain. and 1 link shows what distance
Why the height of the bridges over the river are very low?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)