if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
How do you determine specific gravity of cement?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
What is BDF flooring?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
How we decide the depth and size of footing? Give a example?
how to prepare Steel schedule or Bar bending schedule.
Why is concrete cube test carried out?
how much cement sand n bricks required in im3?and how much in plaster?
What in bending moment, if a moment is free end of cantilever beam?
how to nfind out the specific gravity of sand.aggregate,water please help...