if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
What is the construction cost per sq foot for residential building and give bifurcation of same?
1) What is the compressive strength of concrete 2) What is the tensile strength of steel 3) Why cracks are happening in walls
What is fineness modulus ? and its sieve # ?
what is workability,define it?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
How to deduct block quantity from the slab quantity for concreting for slab.????
What are the advantages and disadvantages of using plastic and timber fenders?
how can change 12mmdia@150c/c bar spacing to 16mmdia
12 Answers Amanah Tech, Envoy Group, Globus Constructions,
What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code
how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
What is the strength of normal brick in india
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)