what is the basic difference between Coloumn & Shear Wall
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4
how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?
how to calculate amount of materials for concreting and plastering?
how to calculate for ramp slop?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
Please design 12.5m long dubbly beam
0 Answers Aarya Construction Design,
can we use .5 water-cement ratio for any type of cement?
what is the construction cost for per cft of multistorryed building in kolkata?
what IS Code used for TOR & TMT steel bar
6 Answers L&T, Lokhandwala Construction,
What is logic behind the use of Steel bar insted of gold bar?
what is slope provided to floor?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)