What are the different types of piles?
Answers were Sorted based on User's Feedback
Answer / rahul
non-displacement & displacement pile
on the basis of material: timber pile,concrete pile, cast
in situ pile,steel pipe.
on the basis of load:point bearing, frictional bearing
Is This Answer Correct ? | 17 Yes | 1 No |
1.friction piles
2.end bearing piles
3.combined piles
4.tension piles
5.anchored piles
6.compacting piles
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / shripad
BRACED PILE ,FRICTION PILE,COMPACTION PILE,UNDERREAMED
PILE,ANCHORD PILE...............
Is This Answer Correct ? | 2 Yes | 3 No |
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
rcc concrete grade uses
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How can find weight fosmula in kg/m for circular cylinde steel bar?
what is daily progress of a steel fixer average how many kilograms he can fix in 8 hours average
1 Answers Al Latifia Trading Contracting,
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
what are the values of compressieve strenght?
what are the ffactors you considered choosing the course?
what is velocity of approach?
What is quantity of cement and sand required for 2000sqft of tiling?