what quantities of work done in terms of sq.mts/day/ of
8hrs for each varpenter (shuttering) and Steel fitter in
terms of Tonnes. For slabs, Columns etc.?
No Answer is Posted For this Question
Be the First to Post Answer
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What is the full form of BHEL? A) Bharat hydroelectricity Limited B) Bharat Heavy Electronics Limited C) Bharat Heavy Electricals Limited D) Bharat Heavy Enterprises Limited
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
What is the coeffiencent Friction Angle between Steel and Ashphalt?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
polavaram project is situated inwhich place?
if i want to change the dia of some bar in a structure,then which formula should be used to find the spacing for the bar of new dia?
Which Types Of Bricks ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how many kilograms of binding wire in 1 kilograms of steel bars
what is spt
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)
2 Answers Unity Infraprojects,