Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE
DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND LAYING THE
CABLES

Answers were Sorted based on User's Feedback



IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND..

Answer / anil

In overhead cables, we donot require any cooling media as
air is cooling media. whereas in Under ground cables, in
pucca trench, we put sand around the cable before is it is
cemented.The reason for sand is that it absorb water and can
help in transmit the heat from cable.

Is This Answer Correct ?    5 Yes 2 No

IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND..

Answer / k.prakashchandra

Sand remains in the form of loose grains forever,hence
location and removal of cable become easy.Overhead cables
require supporting structures and wires.

Is This Answer Correct ?    1 Yes 6 No

Post New Answer

More Electrical Engineering Interview Questions

what is standard height of an energy meter from ground?

2 Answers  


In a three-phase full converter, output voltage pulsates at frequency of a. f b. 2f c. 3f d. 6f

2 Answers  


1 KVAR = 1.3Amps but, 25KVAR capacitor/690V capacitor takes just 21Amps as leading current, what is the reason? Please explain...

1 Answers  


what is the per unit cost of generation of electricity at thermal,hydro,desael,solar,gas power plant

1 Answers  


toughest decision you ever had to make

1 Answers   Infosys,


critically criticize the application of ring main unit in power system

0 Answers  


What are the different sign conventions used in electric circuits?

0 Answers  


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

0 Answers  


Three way plug point is there ,in that plug why we need earth pin is bigger than compare with phase and nutral pins?

7 Answers   IIT,


is there any pottential in neautral?

3 Answers  


THERMAL CAPACITANCE IS MEASURED IN..................................................

0 Answers   SSC,


How to calculate the load loss and no load losses of the power Transformer? i am having the following details : full load ct : in AMP HV :1676 ; LV:31.5 1800 KVA ;33KV/620 V for wind mill applications

2 Answers   ReasonSoft,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)