IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE
DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND LAYING THE
CABLES
Answer Posted / k.prakashchandra
Sand remains in the form of loose grains forever,hence
location and removal of cable become easy.Overhead cables
require supporting structures and wires.
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
What is the basic rule for block diagram reduction technique?
How the setting of the vector surge relay shall be calculated when the relay is to be used for Grid islanding application?
If we impress a dc voltage of 230 V on an unloaded 230 V, 50 Hz transformer it wi A give high secondary voltage B burn out C give secondary voltage as per K D none of these
Is electro plating what type of load whether resistive, inductive or capacitive loads
Why LED light has advantage of rapid reflection ,although other lights alse reflect.? and this light is considered to be best for transmission usage in case of Free optics
how does high earth to neutral voltage affect electronic equipment?
Explain the functioning of diode?
plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.
What is core CT & it's function?
What is the high series capacitance winding on high voltage power transformer ?
lorteny method
how to decide the panel size like MDB ,SMDB PANEL SIZES
relation between power station capacity and voltage level?
what is the basic construction diffrance between servo motor ans sqiralcage induction motor
please write motor, transformer, Generator setting, fault level calculation of Tr.etc