I am getting above 60 V as open delta voltage against single
phase unit ICT at tertiary delta formed and ICT getting
trippped on NDR. ICT tested and found in order. PTs provided
on tertiary are tested and in order. what may be the reason?
No Answer is Posted For this Question
Be the First to Post Answer
What should be the setting of an earth fault relay.
what is the importance of Partial Dischage test for Electrical Equipments
How work of capacitor in dc supply...???
what is the working principle of UPS?
FEINGING DECREASES THE FLUX DENSITY IN THE AIR GAP. HOW?
what is x'mer ,isolation x'mer & yltra-isolation x'mer?????
why Copper loss is represented as I square R ?
what is the string efficiency
Why 66KV is step down to 11KV and then 433v, not directly 66KV to 433v ?
why the altrnator(AVR) not showing the any voltage after making the new winding and insulation?
how is control wiring coding is done in a CRP panel ?
0 Answers Genus, Havells, Hindustan Power Projects,
What are approaches to tackle sedimentation problem of reservoir?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)